Project ATREIDES: Concurrent Engineering for Martian Atmospheric Exploration

This two-week intensive project focused on the preliminary design of ATREIDES, a Martian orbital mission utilizing a LiDAR instrument to characterize lower-atmosphere wind profiles and dust dynamics. Serving as the Project Manager and Systems Engineer (PM/SE) for a multidisciplinary team of seven, I coordinated the Science, Platform, and Orbit poles within a Concurrent Design Facility (CDF) framework. My role involved ensuring technical coherence across subsystems while developing the mission's core management tools, including a 15-year master schedule, a comprehensive risk management strategy, and a detailed industrial cost model.

image of a space exploration interface in holographic display
Project INSIGHT

TYPE

Academic Project

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Suspendisse varius enim in eros elementum tristique.

CONTEXT

Paris Observatory

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Suspendisse varius enim in eros elementum tristique.

YEAR

2026

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Suspendisse varius enim in eros elementum tristique.

DURATION

2 weeks

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Suspendisse varius enim in eros elementum tristique.

LOCATION

Paris, FRANCE

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Suspendisse varius enim in eros elementum tristique.

LINK

ProjeCT DETAILS

Mission Context and Scientific Rationale

The ATREIDES mission was conceptualized to address critical knowledge gaps in Martian planetary science, specifically regarding the interactions between the lower atmosphere and the planet's surface. The scientific objective is to perform global mapping of horizontal wind speeds and dust vertical distribution using an orbital LiDAR. By characterizing wind regimes and dust transport mechanisms, the project supports long-term NASA goals for sustainable human exploration, providing essential data for forecasting dust storms and ensuring the safety of future inhabited infrastructures during Entry, Descent, and Landing (EDL) phases.

PROJECT DETAILS

Project Management and Lifecycle Strategy

I was responsible for defining the mission's end-to-end lifecycle, translating high-level objectives into a structured Master Schedule spanning 15 years. This roadmap detailed the transition from Phase A (Feasibility) through to Phase E (Operations and Data Exploitation). Key tasks included identifying the critical path, managing time margins for integration and testing (AIT/AIV), and aligning the development timelines of the Science and Platform poles to ensure mission readiness for the targeted launch window.

PROJECT DETAILS

Systems Engineering and Concurrent Design Coordination

Operating in a Concurrent Engineering (CDF) environment, I acted as the primary technical interface between the mission's specialized poles. As the Systems Engineer, my focus was on managing system-level requirements and facilitating technical "trade-offs" to resolve subsystem conflicts. I ensured that the platform's power, mass, and data-handling capabilities were perfectly sized to support the LiDAR instrument’s requirements while maintaining a stable orbit, ensuring that all design decisions remained consistent with the overall mission architecture.

PROJECT DETAILS

Risk Assessment and Mission Assurance

To guarantee mission success, I implemented a robust Risk Management framework that identified and quantified over 20 technical and programmatic risks. By establishing a criticality matrix based on probability and severity, I prioritized threats such as instrument SNR degradation due to Martian dust properties or platform power failures. I developed targeted mitigation plans, including hardware redundancies and conservative design margins, to transition high-criticality risks into acceptable mission parameters.

PROJECT DETAILS

Industrial Cost Modeling and Resource Planning

I conducted an in-depth Cost Analysis to validate the project's economic feasibility and industrial credibility. This involved modeling workforce requirements, calculated in Man-Days, for complex phases such as unit testing, system integration, and final acceptance testing. By evaluating facility costs and integrating risk-related financial margins, I produced a realistic budget forecast for the entire mission duration, demonstrating the ability to balance high-level engineering ambitions with the pragmatic constraints of the global space industry.

Want to Know More?

Download the full project report for in-depth technical documentation and detailed findings.

Project report
image of engineers working on satellite components [team]
image of engineers working on satellite components [team]
image of engineers working on satellite components [team]
No items found.

Explore my other projects